The tree RGBW controllers can be installed under the tree bus, as can cables that feed the tree bus and 24V power supply into the building’s electrical system.
To do this, as usual, place a terminal block for the outlet cable directly under the desired tree bus and configure it as follows:
- Activate “individual cable designation” and document the CS area of the tree cable. This step is also possible with CAT or Y(St)Y cables.
- Select which power supply outlet should provide the 24V supply.
- In the “Type” column, configure which conductors are supplied with the tree bus and which ones are supplied with 24V.

Tip:
We do not (yet) allow multiple power supply units to be assigned to a single outlet cable. If you want to supply the tree cable with 2 different 24V voltages, you must split the terminal block:
- Install a terminal block with 4 conductors representing the 0.8 CS area.
- Place a second terminal block with 2 conductors directly behind it to represent the 1.5 CS area, which can then be supplied by another power supply unit.
We are planning to make it possible to create tree cables with fewer clicks and double power supply assignment in future versions.