We’ve added a new export for the test report. This lets you download a VDE-compliant test report directly from stromlaufplan.de and keep using it.
The best part: If you created your plan with stromlaufplan.de, many of the most time-consuming details are already pre-filled automatically.
That means cables, protection devices, and important key values no longer have to be painstakingly transferred by hand from the wiring diagram into a separate Excel template. This saves time, reduces typos, and ensures the test report and wiring diagram match up better.

In addition to the measurements, the cover sheet with the installation’s master data and the sections “Visual inspection” and “Testing”, plus other important details such as proof of the equipotential bonding system, is of course included.

Of course, the export doesn’t replace on-site testing.
The measured values still need to be determined and entered correctly by a qualified professional.
You’ll find the new test report as usual under Exports.
There you can download the Excel file and then open it in Excel or a compatible spreadsheet program.
Automatically determine and transfer measured values
But that’s not all.
We worked together with the company WIHA and the Sparkify Cloud solution. If you want to work fully digitally:
- create the wiring diagram with stromlaufplan.de
- import all cables and protection devices into the Sparkify app
- carry out the measurement with the new WIHA MFT
- and transfer all measured values to the app automatically!
Here’s a quick visual impression for you:
In short
With the new test report export, you can:
- create a VDE-compliant test report as an Excel file
- automatically take over cables from your plan
- have protection devices assigned automatically
- pre-fill key values from stromlaufplan.de
- transfer less manually and avoid errors as a result
- and optionally transfer the data to WIHA MFT and Sparkify Cloud
Enjoy the new test report export!